Case study
The Lensbury Club Gymnasium

The Lensbury Club Gymnasium

New Hotel Gymnasium

January 2020

The Brief

Upgrade the tired hotel gymnasium and studios to create a modern sleak design.

The Fitout

Reusing some of the existing spaces left from the office layout we created male & female changing/ toilet facilities including bespoke joinery from our workshop installing lockers & toilet cubicles. High end floor finishes, installation of fire rated plasterboard and glazed screens, birch plywood wall coverings.

The Stripout

Strip out the old gymnasiums and studios and reconfigure to create a larger functional space. With help from our In house award winning lighting designer the accent lighting on the modern fin walls looks fantastic. The rest of the fitout consisted of –

  • Mechanical & Electrical
  • Bespoke joinery
  • Vinyl flooring
  • Acoustic rubber flooring
  • Painting & decorating
  • Tiling
  • Feature vinyl wallpaper graphics

What The Lensbury Club said

If you are considering using Oakwhite Contracts, I have no reservation in recommending them to you unreservedly. Going forward they would be my contractor of choice. If you are in London at any point, I would be delighted to show you around the Lensbury where you could see the quality of their work first hand.